NTC Nefetegazdiagnostika LLC was founded in 1997. We are a technical diagnostics and hazardous facilities industrial safety review company.
We major in:
Today NTC Neftegazdiagnostika is one of the recognized leaders in the oil and gas industrial safety assurance area. Through our lifetime we have inspected tens of thousands kilometers of mainline, field pipelines and piping, hundreds of oil and products storage tanks, pressure vessels. Advanced projects of constructed pipelines inline inspection have been completed. Our company is the Russian leader in new constructed pipelines inspection, smart pigging and diving inspection of oil and gas pipelines. We are engaged not only in diagnostics, but in repair and integrated pipelines protection against adverse effects.
NTC Neftegazdiagnostika works in collaboration with all Russian oil and gas leaders, performs works in Kazakhstan, Uzbekistan, Saudi Arabia. NTC Neftegazdiagnostika is certified per quality management system ISO 9001-2001, ISO 14001, OHSAS 18001, it has a certified NDT laboratory, Rostekhnadzor license for geodetic surveying and mapping, Russian FSB and Republic of Kazakhstan licenses for maintenance, inspection and repair of main oil pipelines, tanks and pressure vessels. The company has an integrated administration management system (AMS). We are a winner of the European Standart, an international European quality award.
Member of the Scientific and Industrial Research Union RISKOM.
27.03.2016 - 05.04.2016 Viktor Leshchenko, Director General “NTC “Neftegazdiagnostika” LLC, visited Calcutta (India) to participate ...
A sole agency agreement was signed between NTC NEFTEGAZDIAGNOSTIKA LLC and Abdel Hadi Abdullah Al-Qahtani & Sons Company
On September 12, the laboratory VNIPI "VZRYVGEOFIZIKA" conducted New website launched! Inline inspection of main gas line Nord Stream pipeline 1-East, Dn 1220×34.6/41 mm, 1224.4 km long Inline inspection of main gas line Nord Stream pipeline 2-East, Dn 1220х34.6/41 mm, 1224.4 km long Segment 1, gas pipeline Ø 1220 mm. OPF – BS-2, 295 km long. Segment 2, gas pipeline Ø 1220 mm. BS-2 – OET, 328 km long. Inline inspection of the offshore oil pipeline "OIFP D-6 – oil gathering facility "Romanovo", Dn 273x18, 51.812 km long. Integrated diagnostics of sub-sea oil pipeline "OIFP – SPM, oil field n.a. Yu. Korchagin" started. Installation and dismantling of temporary pig launchers/receivers Pipeline cleaning, gauging, geometry inspection, magnetic pig inspection Subsea external inspection using ROVs Cleaning of the offshore oil pipeline "OIFP – SPM, oil field n.a. Yu. Korchagin", Dn 325×16.