"Bumi Armada Caspian LLC is satisfied with NTC Neftegazdiagnostika LLC performance and services provided during installation of the repair clamps and expresses its gratitude for ability to solve challenging and technically complex issues promptly and at high quality standart."
25.03.2020 00:00/more...
"...The field works were performed within short timeframes and of the highest professional quality; preliminary reports on the diagnostics’ results were also issued in a timely manner."
26.04.2017 14:26/more...
"The inline inspection of sections of the oil pipeline, in-field flow lines performed by “NTC “Neftegazdiagnostika”, LLC was of the highest quality, even though the project was very difficult."
24.06.2016 07:52/more...
"...The works on inline inspection of subsea pipelines which are carried out by NTC Neftegazdiagnostika LLC were carried out at the high level, despite high complexity of the project, including an underwater location of pig launchers. Especially it should be noted that NTC Neftegazdiagnostika LLC is capable to perform highest complexity works on schedule and without increasing the contract price...."
15.05.2015 07:28/more...
"I hereby confirm high professionalism of NTC Neftegazdiagnostika personnel and availability of extensive list of equipment required to perform different types of diagnostics in this contractor’s non-destructive testing laboratory."
10.04.2015 07:09/more...
|
27.03.2016 - 05.04.2016 Viktor Leshchenko, Director General “NTC “Neftegazdiagnostika” LLC, visited Calcutta (India) to participate ...
A sole agency agreement was signed between NTC NEFTEGAZDIAGNOSTIKA LLC and Abdel Hadi Abdullah Al-Qahtani & Sons Company
On September 12, the laboratory VNIPI "VZRYVGEOFIZIKA" conducted New website launched! Inline inspection of main gas line Nord Stream pipeline 1-East, Dn 1220×34.6/41 mm, 1224.4 km long Inline inspection of main gas line Nord Stream pipeline 2-East, Dn 1220х34.6/41 mm, 1224.4 km long Segment 1, gas pipeline Ø 1220 mm. OPF – BS-2, 295 km long. Segment 2, gas pipeline Ø 1220 mm. BS-2 – OET, 328 km long. Inline inspection of the offshore oil pipeline "OIFP D-6 – oil gathering facility "Romanovo", Dn 273x18, 51.812 km long. Integrated diagnostics of sub-sea oil pipeline "OIFP – SPM, oil field n.a. Yu. Korchagin" started. Installation and dismantling of temporary pig launchers/receivers Pipeline cleaning, gauging, geometry inspection, magnetic pig inspection Subsea external inspection using ROVs Cleaning of the offshore oil pipeline "OIFP – SPM, oil field n.a. Yu. Korchagin", Dn 325×16.